Thursday, March 10, 2011

Mud, mud, mud

Jace's closet is drywalled in and on its way to being finished (mud wise...lol). Hopefully, we will sand and prime his closet and room as well as the spare room (office), and possibly Jon's room. From there we will knock out the landing and game area...then stairs...
The first floor is now insulated as well. I finished the master bedroom's wall that needed insulated yesterday. All that is left is blowing in a bit in attic areas. The insulation has made a huge difference on noise and temperature. Can't wait to turn the new heating and cooling on to see the difference (waiting on finishing all the drywall sanding before we crank them up).
Christy helped clean out some of the rooms the other day. This made a huge difference.
Things are coming along nicely. I believe we have the wood to wrap the beam and post at the stairs...as well as several shelves and some of the cabinets we will construct. We replaced the flooring in the open area (game area). The wood was red oak. This will be great...just need to come up with a planer to resurface the wood.

No comments:

Post a Comment